Authoritative design

What “authoritative” means

blueprint.md is the design. When an implementation and the blueprint disagree, one of them is a bug, and an ADR says which. Nothing else in this repository has that status:

DocumentStatus
blueprint.mdAuthoritative. One file, revised in git. Revision 5 is the current Proposed contract amendment; tags design-rev2 and design-rev3 mark the seeded history.
proposal.mdHistorical. The thesis the blueprint makes concrete; superseded by it and kept for the record. Front matter says so.
../adr/Why. One record per decision. A record binds; it does not restate the design.
../design_review/reviews/Evidence, not authority. A review finds defects and cites measurements. It does not change the design; the ADR that responds to a finding does.
../capability-maps/Evidence. What the pinned libraries actually do, with reproducible probes under evidence/.

Section numbers are citation targets

ADRs, reviews, plans, the agent instructions and the lint all cite the blueprint by section: blueprint §14.3, §D7, §3.1. Those numbers are stable. New material is inserted as a sub-section (§14.3.1), never by renumbering, and scripts/adr.py lint resolves every § citation in every ADR against the headings of blueprint.md — so a renumbering fails governance / adr-lint rather than quietly rotting every record that cited it.

The decision behind that rule is ADR-0033.

The amendment rule

The blueprint changes only through a pull request that:

  1. is labelled adr and titled adr: ADR-NNNN <title> (or is a named follow-up design: PR referenced by that ADR);
  2. adds or changes exactly one decision record under ../adr/;
  3. adds a row to the blueprint’s Revision history table naming the revision, the date, the change and the git tag or pull request;
  4. adds an inline > Decision: ADR-NNNN line under the heading of every section the decision governs, so a reader of the section finds the record without searching;
  5. keeps every existing section number exactly where it was.

An ADR may merge with status: proposed only if the PR is also labelled needs-review. Changes that alter D1–D14, add or remove a crate, add, drop or major-bump a dependency family, change the hashing contract, the Python boundary contract, the metadata conventions or the commit contract, or that deviate from a SHOULD, need an ADR and a design review with an Accept or Accept-scoped verdict before the record becomes accepted. The full table is in ../plans/01-repository-configuration.md §7 and in .codex/skills/adr/SKILL.md.

Revisions so far

RevisionWhat it settled
1The initial blueprint following the proposal.
2The first review’s priority-1 findings (F1–F7, F9, F15); the dependency anchors moved to DataFusion 55.1.0 / Arrow 59.3.0 with family-wide = pins. Tag design-rev2.
3Every finding of both reviews, including the items revision 2 parked (F8, F10, F12–F14, F16, F17) and R2-1 – R2-8, using the four capability maps’ measurements. Tag design-rev3.
4Repository conventions: MSRV equals the pinned toolchain (ADR-0018); workspace layout additions (ADR-0038); documents under docs/ (ADR-0033).
5Proposed: library-backed semantic/quantity admission, complete demand/stage/reuse contracts, guarded kernels/numerics, canonical v2 versus encoded integrity, shared accounted resources and bounded relational/import operators. ADR-0039–ADR-0048; review, implementation handoff.

Evidence labels are mandatory

Every claim in the blueprint, in an ADR, in a plan’s verification section and in a register row carries a charter §D label — Proposed, Interface-checked, Implemented, Tested, Measured, Formally established. Tested and Measured must name the test or benchmark and the conditions. Proposed is not a failure state; an unlabelled claim is.