id: ADR-0040 title: Resolve property demand from normalized seeds and name immutable stage outputs status: accepted date: 2026-09-13 deciders: [paul-heyse] level: decision principles: [DM-18, DM-20, DM-21, DM-22, DM-31] blueprint: [§D8, §4.1, §6.11, §9.6, §14.1] review: docs/design_review/reviews/design_review_blueprint-rev5-contracts_2026-09-13.md#6-acceptance-gates evidence: Proposed supersedes: [ADR-0011] superseded-by: null revisit: A selected method requires demand that cannot be declared over the finite normalized scope before realization. verification: just adr-lint; just docs; docs/plans/02-blueprint-revision-5-contracts.md Verification; bash docs/design_review/evidence/blueprint-rev4-2026-09-13/run.sh

ADR-0040: Resolve property demand from normalized seeds and name immutable stage outputs

Context

R4-06 identifies P6 reading P7/P8 equations and P15 initialization requirements despite preceding those stages. A relation-wide single producer also cannot describe successive math artifacts.

Scope

Amends demand discovery and stage ownership within the existing three artifact levels. No fourth model authority or database is introduced.

Drivers

Make the pass DAG decidable before realization, including law-only and initializer-only demand. Allow several stages to carry one schema without competing mutable producers.

Options

Discover demand from realized equations through an implicit backward loop: rejected. Contract a larger mutually recursive compiler stage: viable but unnecessary for declared demands. Resolve normalized seeds and check realization completeness: selected.

Outcome

Extract property-demand seeds from normalized template, law, port, display and initializer declarations. P6 closes selected method requirements over a finite bound scope before realization. Pass contracts name immutable input/output ports; successive stages may carry the same relation schema under distinct artifact handles.

Consequences

P7 through P15 cannot invent new property demand. They reject undeclared requirements and incomplete providers; stage-output ownership and acyclicity become registry checks.

Compensating controls

The implementation gates are explicit in plan 02. Document acceptance does not establish runtime behavior. Deferred optimizations remain disabled until their register trigger and conformance evidence are satisfied.

Confirmation

Plan 02 specifies demand_seed_closure, stage_bundle_graph and realization-completeness fixtures, including law-only and initializer-only requirements. just adr-lint and just docs check documentation structure only; the plan distinguishes these checks from future behavioral acceptance.

Pros and cons

Finite seeds and named ports make missing requirements and producer ambiguity observable. Authors must declare opaque requirements early; undeclared late demands are refused instead of triggering an invisible extra compile loop.

More information

See the governed blueprint sections, the revision-4 review, its reproducible library evidence, the revision-5 contract review, and plan 02.

Status history

  • 2026-09-13 — proposed before the revision-5 blueprint amendment; user requested reconciliation of all review findings and library opportunities.
  • 2026-09-13 — proposes superseding ADR-0011 for the corrected contract above; accepted arguments remain immutable.
  • 2026-09-13 — accepted (revision-5 review, Accept for bounded proposed scope; evidence remains Proposed until the wave-1 implementation review).